Crawfordsville, IN
Downtown Loop Trail
HWC Engineering provided full-time inspection services for the Downtown Loop Trail project in Crawfordsville, Indiana.
The Crawfordsville Downtown Loop Trail consisted of removing and replacing all the existing concrete curb and gutter, sidewalk, concrete approaches, asphalt street approaches, ADA curb ramps, and the installation of stormwater improvements along various streets in Downtown Crawfordsville.
The new construction consisted of a 10 Foot wide hand tooled concrete walkway that runs the length of Grant Ave, Wabash Ave to Walnut, and Walnut to Main St. The new concrete walkway has brick diamond inlays every 20 Ft as well as intricate brick paver designs at all intersections with Historic Downtown Crawfordsville etched into the pavers. This is the first of several phases to construct a walking trail throughout Downtown Crawfordsville to promote a healthy lifestyle for the City’s residents and the students of Wabash College.
The $1.2 Million project was funded by INDOT and the City of Crawfordsville.