Jackson County, IN
US 50 HHA Overlay, INDOT Seymour District
HWC was selected to provide design services for the US 50 HMA Overlay project under the INDOT On Call contract in the INDOT Seymour District. HWC extended the functional life of the asphalt overlay by addressing cracks at joint deterioration and longitudinal cracks by construction of partial and full depth patching of the underlying concrete pavement and application of a 2” mill/fill of the asphalt overlay.
HWC also brought the curb ramps to current ADA standards, as well as updated the nine existing traffic signals to have APS devices installed where applicable.